The first version of our highly anticipated HJC to Cardo intercom adapter has reached a significant milestone. Currently I have got the a working digital model and will be ready to convert this into 3D very soon. My test parameters focus on three critical aspects: structural strength, aerodynamic performance, and ergonomic fit. This testing phase is crucial to ensure we deliver a product that meets the highest standards of quality and functionality.

Development Timeline

Initial Design Phase (coming to a close)
The v1 DFM design started on February 5th and closes on 25th, during which our engineering team (me) finalised the initial adapter design specifications.

Upcoming Stages

  • Testing (Feb 25-March 4): Validating design choices and identifying any potential weaknesses.

  • Product Development (March 5-15): Refinement of design based on testing results

  • Quality Assurance (March 15-17): Final testing and quality control procedures

  • Production Phase (March 18-25): First print batch manufacturing

  • Shipping (March 26): Pre-order dispatch begins

Pre-Order Information

We're maintaining our commitment to the scheduled late March shipping timeline. For those interested, pre-orders remain open and will be dispatched starting March 26th.

If you'd like to be part of a pilot program, please email me to receive an early prototype

Leave a comment

Please note, comments need to be approved before they are published.

This site is protected by hCaptcha and the hCaptcha Privacy Policy and Terms of Service apply.

Latest Stories

This section doesn’t currently include any content. Add content to this section using the sidebar.